Before Pouring

This update is as of November 18, though it’s taken me a while to post it.  At this point, the builders have laid the form boards; the plumber has done a rough-in, and the inspector has checked the plumber’s work, so that the floor can be poured.  We were out of town for the holidays and weren’t able to see the concrete work that has been done yet, but these photos show the form boards and the plumbing work.

It’s amazing how TINY the house looks, just laid out on the ground.  The first floor is over 1200 sq. feet, but when we’re wandering around it, it feels much smaller than our <800 sq. foot apartment!  So without further ado, the most recent photos:

Me in front of the bathroom:

Another view of the bathroom:

Looking at the kitchen & bathroom:

Advertisements

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s


%d bloggers like this: